Collapsed Sheet Pile Repair on Jalan Bunga Dalam Completed
access_time December 13 2020 03:56 PM remove_red_eye 1161
Reported by Nurito | Translated by Nugroho Adibrata
Reported by Nurito | Translated by Nugroho Adibrata
This sheet pile has 10 meters length, 25 centimeters width and 1.5 meters height
The collapsed sheet pile repair work on Jalan Bunga Dalam II, RW 09, Palmerian, Matraman, East Jakarta has finally done, on Sunday (12/13).
Matraman Sub-district Water Resources (SDA) Executing Unit Head Erland Sianipar expressed, its repair was conducted for approximately ten days by deploying 15 personnel of the Mataraman Sub-district SDA Task Force.
Collapsed Sheet Pile on Jalan Asem Gede Utara Being Repaired"This sheet pile has 10 meters length, 25 centimeters width and 1.5 meters height," he expressed, Sunday (12/13).
Hopefully it could maximally accommodate water thus the water flows smoothly," he stated.