You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Longsor di Jl Bunga Dalam Rampung

Collapsed Sheet Pile Repair on Jalan Bunga Dalam Completed

This sheet pile has 10 meters length, 25 centimeters width and 1.5 meters height

The collapsed sheet pile repair work on Jalan Bunga Dalam II, RW 09, Palmerian, Matraman, East Jakarta has finally done, on Sunday (12/13).

Matraman Sub-district Water Resources (SDA) Executing Unit Head Erland Sianipar expressed, its repair was conducted for approximately ten days by deploying 15 personnel of the Mataraman Sub-district SDA Task Force.

Collapsed Sheet Pile on Jalan Asem Gede Utara Being Repaired

"This sheet pile has 10 meters length, 25 centimeters width and 1.5 meters height," he expressed, Sunday (12/13).

Hopefully it could maximally accommodate water thus the water flows smoothly," he stated.

Linked News
Popular News indeks
  1. The 2026 SEA V Cup Officially Begins

    access_time23-07-2026 remove_red_eye1517 personAldi Geri Lumban Tobing
  2. Commission E Enlists Religious Leaders to Fight Drugs and Violence

    access_time24-07-2026 remove_red_eye1277 personFakhrizal Fakhri
  3. Jakarta Government Prepares Rp 249 B to Renovate Four Schools

    access_time25-07-2026 remove_red_eye859 personDessy Suciati
  4. 20 Shade Trees Planted on Jalan Komodor Halim Perdanakusuma

    access_time24-07-2026 remove_red_eye796 personNurito
  5. Transjakarta Officially Commences Jakarta Batavia Open-Top Bus Service

    access_time24-07-2026 remove_red_eye791 personBudhi Firmansyah Surapati